Skip to main content

tommy's natural pet supplies

Free delivery when you spend over £39 (Excluding Raw Frozen)

Sports Training Long Lead – Reflective

Price range: £20.95 through £26.90

Sports Training Long Lead – Reflective

Sports Training Long Lead – Hem & Boo

Give your recall training a serious upgrade. The Sports Training Long Lead – Reflective is crafted for confident training sessions, active recall practices, and walks with added freedom—without losing control or safety.

Build Strength You Can Trust

Made from tightly woven nylon, this lead delivers the perfect balance of strength and flexibility. It handles pull and distance work with ease while keeping its sporty look intact.

Visibility You Can Rely On

With reflective accents, this lead enhances visibility during dawn and dusk training or walks. Stay safe and seen in all conditions.

Master Recall, Safely

Available in generous lengths—5 m, 10 m, and 15 m—this lead gives you flexible control during recall practice or obedience drills.

Training-Ready Design

Designed for reactive pups, working breeds, or everyday pets building recall confidence. Pair it with your Sports Harness and Collar for a polished, consistent look.

FREE Shipping on Orders Over £40

Quality Pet Friendly Products

Raw Frozen Delivered Next Day

Description

Sports Training Long Lead – Reflective

Sports Training Long Lead – Hem & Boo

Give your recall training a serious upgrade. The Sports Training Long Lead – Reflective is crafted for confident training sessions, active recall practices, and walks with added freedom—without losing control or safety.

Build Strength You Can Trust

Made from tightly woven nylon, this lead delivers the perfect balance of strength and flexibility. It handles pull and distance work with ease while keeping its sporty look intact.

Visibility You Can Rely On

With reflective accents, this lead enhances visibility during dawn and dusk training or walks. Stay safe and seen in all conditions.

Master Recall, Safely

Available in generous lengths—5 m, 10 m, and 15 m—this lead gives you flexible control during recall practice or obedience drills.

Training-Ready Design

Designed for reactive pups, working breeds, or everyday pets building recall confidence. Pair it with your Sports Harness and Collar for a polished, consistent look.


Why Active Owners Choose It

Durable nylon for long-lasting use

Reflective threading for safety at any hour

Length options to suit training styles (5–15 m)

Perfect for professional or at–home training routines

Additional information

LONG LINE LENGTH:

5MTR, 10MTR, 15MTR